Lining of Newly Excavated Pond
AGA Group Enviro-Fix Limited was contracted to line a newly excavated pond as part of a broader landscaping package for a rural site.
AGA Group Enviro-Fix Limited was contracted to line a newly excavated pond as part of a broader landscaping package for a rural site.
The primary objective was to replace the existing timber deck and parapet with a more durable and environmentally friendly alternative.
Enviro-Fix recently completed a multifunctional flood alleviation and habitat creation project on behalf of Harrow Council in partnership with Wild Futures Outdoors Limited.
Enviro-Fix was commissioned by Chalfont St Giles Parish Council to deliver a full replacement of three ageing wooden boardwalks situated within a picturesque riverside setting popular with local residents and visitors.
The project involved the removal of an aging control structure at a pond in Maidstone followed by the installation of a new precast concrete headwall system.
In 2024, Bromsgrove District Council commissioned Enviro-Fix to undertake essential restorative works to the park’s pond which was built in the 1960’s.
As part of the Reclaim the Rain initiative led by Norfolk County Council, this project at Thompson Marsh focused on improving resilience to flood and drought risk in small rural communities.
The Lee Valley Ice Centre, located in the Lower Lea Valley, London, underwent a major redevelopment and expansion project to create a state-of-the-art ice rink facility.
We embarked on a prestigious project to clear the overgrown vegetation surrounding the historic Norwich Castle.
In this project we underwent the profiling of the riverbanks following the removal and burial of a large volume of Himalayan Balsam.