Design and Installation of New Headwall

Project Scope

The project involved the removal of an aging control structure at a pond in Maidstone followed by the installation of a new precast concrete headwall system with integrated water level control and debris management features.

These works were part of a larger project that AGA had undertaken for Maidstone Borough Council involving works at three pond sites in the area amounting to a contract value of £157,136.00. 

Project Scope

The project involved the removal of an aging control structure at a pond in Maidstone followed by the installation of a new precast concrete headwall system with integrated water level control and debris management features.

These works were part of a larger project that AGA had undertaken for Maidstone Borough Council involving works at three pond sites in the area amounting to a contract value of £157,136.00.

Removal of Existing Infrastructure

    • The existing weir and stop log system was dismantled and removed.
    • The old, culverted pipe was excavated and replaced to ensure compatibility with the new headwall.

Installation of New Headwall System

      • A precast concrete Althon Headwall H6C A was installed.
      • The headwall featured a 1100mm back wall height and an opening sized for a 375mm internal diameter pipe.
      • A Galvanised Mild Steel (GMS) Close Coupled Grating was fitted to prevent debris ingress and improve safety.

Water Level Control System

        • A channel-mounted stop log system was installed halfway down the spillway.
        • The system included: 
          • GMS frame (height = opening height + 100mm)
          • 5 x 100mm aluminium stop logs
          • Locking brackets and lifting hooks for secure and adjustable water level management

Design Considerations

        • Hydraulic Performance: The headwall and stop log system were designed to handle variable flow rates while maintaining pond water levels within desired thresholds.
        • Durability: All components were selected for long-term performance with minimal maintenance, using corrosion-resistant materials.
        • Environmental Integration: The installation was landscaped with native vegetation to blend with the surrounding environment and reduce erosion.
        • Safety & Access: The trash screen and lifting hooks provided safe access for maintenance and inspection.

Outcome

The upgraded infrastructure significantly improved water flow control, reduced maintenance needs, and enhanced the pond’s ecological stability. The client was particularly pleased with the modular stop log system, which allows seasonal adjustments to water levels with ease.

Design of Headwall shown below:

The following photographs show work in progress