Marginal Habitat Works at Darley Park

Darley Park

Darley Park is a sprawling urban park on the banks of the River Derwent, just north of Derby city centre. The adjacent park areas of Darley Park, Derwent Park, Parker’s Piece, Chester Green, Darley Fields and Nutwood Nature Reserve span a total area of 80 acres.

The Works

Following the removal and burial of a large volume of Himalayan Balsam, we could commence the profiling of the riverbanks.

Darley Park

Darley Park is a sprawling urban park on the banks of the River Derwent, just north of Derby city centre. The adjacent park areas of Darley Park, Derwent Park, Parker’s Piece, Chester Green, Darley Fields and Nutwood Nature Reserve span a total area of 80 acres.

The Works

Following the removal and burial of a large volume of Himalayan Balsam, we could commence the profiling of the riverbanks.

Installation

Two sections totalling approx. 125m of river bank length were identified for installing a low water marginal ledge. 

These locations were chosen to avoid recorded archaeological finds, areas of dense mature bank top trees and provide an aspect that allows more light to help marginal aquatic vegetation to develop.

We supplied and installed Hazel brushwood faggots to provide a filling between the rows of posts and to support the coir rolls at the edge of the ledge. We used our 300mm diameter x 2m lengths, tied with polypropylene multi-strand fibre twine – 3 ties per bundle. 

From our nursery in Norfolk, we supplied and installed pre-planted (standard native wetland type mix) coir pallets. These were installed on the top of the fine geotextile and secured in place to the top of the lower ledge. 

To create the ledge of the upper part of the existing steep bank we re-profiled to a gentler angle, and used the spoil (above) to form a lower bank / underwater ledge.

Careful profiling was required to ensure the lower ledge did not extend beyond 4m into the channel to avoid impacts on river users, nor limit any deflection of flow.

We supplied and installed two layers of fine-mesh, biodegradable coir geotextile to form the ledge margins, creating a rooting substrate for plants to establish and retain fine materials.

We also supplied and installed a double row of 100mmØ (FSC) treated & pointed, softwood timber posts at 1.5m spacing along the outer edge of the ledge to form a revetment.

We also supplied and installed recycled plastic fishing platforms and made alterations to existing platforms at various sites across the park including the rebuilding of steps and access paths.

Enviro-Fix (A.G.A. Group)

Environmental Contractors

Engineering Nature