Runnymede Borough Council commissioned A.G.A. Group Enviro-Fix Limited to carry out essential repairs to a well-used public footbridge located in the scenic area of Virginia Water, Surrey. The bridge, which spans a small watercourse, had deteriorated over time, with its wooden deck and parapet showing significant signs of wear and weathering.

Given the bridge’s proximity to a watercourse and its location within a sensitive environmental setting, the project required careful planning, sustainable material choices, and strict adherence to environmental regulations.

Background

Runnymede Borough Council commissioned A.G.A. Group Enviro-Fix Limited to carry out essential repairs to a well-used public footbridge located in the scenic area of Virginia Water, Surrey. The bridge, which spans a small watercourse, had deteriorated over time, with its wooden deck and parapet showing significant signs of wear and weathering.

Given the bridge’s proximity to a watercourse and its location within a sensitive environmental setting, the project required careful planning, sustainable material choices, and strict adherence to environmental regulations.

Scope of Works

The primary objective was to replace the existing timber deck and parapet with a more durable and environmentally friendly alternative. Enviro-Fix proposed the use of recycled plastic decking materials, offering enhanced longevity, reduced maintenance, and a significantly lower environmental footprint.

Key elements of the project included:

  • Removal of the existing wooden deck and parapet
  • Installation of new recycled plastic decking and parapet
  • Ground remediation and waste management
  • Environmental compliance and permitting

Environmental Considerations

Due to the bridge’s location near a watercourse, A.G.A. Group applied for and secured a Flood Risk Activity Permit from the Environment Agency on behalf of the client. This ensured that all works were compliant with environmental regulations and that the risk of pollution or disruption to the watercourse was minimised.

Sustainable Waste Management

Sustainability was a core principle throughout the project. A.G.A. Group implemented a closed-loop waste management strategy:

  • The old timber components were carefully dismantled and transported back to the Enviro-Fix yard for appropriate recycling or disposal.
  • All plastic offcuts and waste generated during the installation of the new decking were collected and returned in bulk to HAHN Plastics, the original supplier, for recycling and reuse in future products.
  • The site was left clean and restored, with any ground disturbance repaired to its original condition.

Outcome

The project was completed successfully, delivering a structurally sound and visually appealing footbridge that aligns with modern sustainability standards. The use of recycled materials and responsible waste handling demonstrated our commitment to environmental stewardship and innovation in construction.

Enviro-Fix’s Design and photographs of the finished bridge are shown below