Chalfont St. Giles Boardwalks
Introduction
Enviro-Fix was commissioned by Chalfont St Giles Parish Council to deliver a full replacement of three ageing wooden boardwalks situated within a picturesque riverside setting popular with local residents and visitors. The existing structures—measuring 21.3m, 16m, and 8.5m in length, each with a width of 1.5m—had reached the end of their service life due to prolonged exposure to weather conditions and natural environmental wear.
Introduction
Enviro-Fix was commissioned by Chalfont St Giles Parish Council to deliver a full replacement of three ageing wooden boardwalks situated within a picturesque riverside setting popular with local residents and visitors. The existing structures—measuring 21.3m, 16m, and 8.5m in length, each with a width of 1.5m—had reached the end of their service life due to prolonged exposure to weather conditions and natural environmental wear.
- Chalfont St. Giles Parish Council
- Riverside Boardwalks
- £40,000
- Completed February 2024 (3 weeks)
Sustainable, Long-Lasting Materials
To provide a robust and futureproof solution, the new boardwalks were constructed entirely from recycled plastic materials. This choice offered multiple benefits:
- Exceptional durability, resisting rot, warping, and moisture damage.
- Significant reduction in maintenance requirements compared to timber.
- A sustainable lifecycle, helping to divert plastic waste from landfill and reducing the demand for virgin materials.
The new installations were designed to closely match the look and proportions of the original wooden structures. This ensured that the boardwalks blended naturally with their surroundings and maintained the tranquil aesthetic of the riverside environment.
Minimising Environmental Impact
Environmental protection was a core priority throughout the project. To reduce on-site disruption and limit waste:
- Most structural components were precision cut off-site, ensuring minimal cutting during installation.
- This approach allowed for a faster, cleaner installation process, with fewer vehicle movements and reduced material handling in the sensitive riverside location.
- Enviro-Fix also worked under an existing arrangement with our supplier to return all off-cuts for recycling, ensuring a closedloop material process and preventing excess waste.
Efficient Delivery and Lasting Benefits
Through careful planning, responsible material selection, and efficient on-site practices, Enviro-Fix delivered a seamless upgrade to the public walkways. The new boardwalks now offer:
- Improved safety and slip resistance for yearround use.
- Greatly extended lifespan, dramatically reducing long-term maintenance costs for the council.
- Enhanced environmental outcomes, supporting the Parish Council’s sustainability goals.
Enviro-Fix is proud to have contributed to the preservation and enhancement of this wellloved natural space, ensuring that residents and visitors can enjoy safe, accessible riverside paths for many years to come.
Photographs of the completed boardwalks are shown below.
Enviro-Fix (A.G.A. Group)
Environmental Contractors
Engineering Nature
If you have a question or enquiry, please do not hesitate to call our team. If it is outside business hours, drop us an email – we’d love to hear from you