Headstone Manor - Flood Alleviation and Habitat Creation Works
Project Overview & Objectives
Enviro-Fix recently completed a multifunctional flood alleviation and habitat creation project on behalf of Harrow Council in partnership with Wild Futures Outdoors Limited. The scheme was designed to reduce flood risk while delivering long-term ecological enhancements through sensitive watercourse restoration and landscape works.
Project Overview & Objectives
Enviro-Fix recently completed a multifunctional flood alleviation and habitat creation project on behalf of Harrow Council in partnership with Wild Futures Outdoors Limited. The scheme was designed to reduce flood risk while delivering long-term ecological enhancements through sensitive watercourse restoration and landscape works.
- Harrow Council/Wild Futures Outdoors Ltd
- Headstone Manor
- £37,200
- Completed March 2025 (3 weeks)
Integrated Flood Management and Nature-Based Solutions
The project combined engineered flood management solutions with nature-based approaches to improve biodiversity and ecological resilience. Key elements included re-profiling the existing watercourse, excavating a new meandering channel, and creating a range of wetland habitats to support wildlife and improve natural flood storage.
Two-Stage Channel Design and Spoil Re-use
A series of two-stage banks and berms of varying dimensions were constructed over a combined length of approximately 100 metres. These features allow high flows to spill onto secondary levels during peak events, reducing downstream flood risk while creating marginal habitats beneficial for aquatic and riparian species. Approximately 100–150m³ of excavated material was re-used on site, forming bunds that supported both landform integration and habitat creation objectives.
Wetland, Reedbed, and Pond Habitat Creation
The new channel alignment was designed to flow from the main watercourse into a shallow reedbed area, incorporating associated scrapes to create a mosaic of wetland environments. These features provide valuable habitat for amphibians, invertebrates, and bird species, as well as slowing water velocities and improving water quality. A new pond was also excavated, further enhancing biodiversity value and contributing to the site’s ecological connectivity.
Scope of Works
The scope of works delivered by Enviro-Fix included:
- Mobilisation of plant, equipment, and materials
- Establishment of site welfare facilities and a secure compound
- Setting out of works in accordance with approved drawings
- Vegetation clearance within the defined working area, undertaken sensitively to protect retained habitats
- Excavation of the new meandering channel, pools, scrapes, reedbed, and pond as specified
- Installation of a 100mm deep riprap layer to the channel bed using 100–200mm stone to provide erosion protection whilst maintaining a natural appearance
- Stockpiling and management of soil arisings adjacent to the access ramp for reuse in habitat formation and bund construction
- Making good of all disturbed areas and full demobilisation upon completion
Project Completion
All works were undertaken with due consideration for environmental constraints and ecological enhancement objectives. The project was delivered safely, on programme, and in accordance with the approved specification.
The completed works provide improved flood resilience alongside lasting ecological and biodiversity benefits for the site. The project was completed on schedule and to the complete satisfaction of Harrow Council and Wild Futures Outdoors Limited.
The plan and photographs below show areas of work on this project.
Enviro-Fix (A.G.A. Group)
Environmental Contractors
Engineering Nature