Project Overview

AGA Group Enviro-Fix Limited (AGA) was contracted by Frosts Landscapes, acting on behalf of a corporate client in Windlesham, to line a newly excavated pond as part of a broader landscaping package for a rural site. AGA was selected for its extensive experience in specialist pond lining and its proven track record across the UK.

Project Overview

AGA Group Enviro-Fix Limited (AGA) was contracted by Frosts Landscapes, acting on behalf of a corporate client in Windlesham, to line a newly excavated pond as part of a broader landscaping package for a rural site. AGA was selected for its extensive experience in specialist pond lining and its proven track record across the UK.

Expertise and Design Development

All AGA operatives involved in the project were fully trained by the product supplier and familiar with the specific liner type required. Drawing on previous experience in designing and installing ponds and lakes nationwide, AGA’s Project Manager developed a tailored design that met the client’s brief and site-specific requirements.

Technical Specification

The pond required the installation of 1,800 m² of EPDM liner (Ethylene Propylene Diene Monomer), a synthetic rubber material with properties similar to butyl rubber, offering durability and flexibility for aquatic environments. The excavation was carried out by a separate subcontractor appointed by the client.

Site Challenges – Groundwater Management

During excavation, a significant amount of groundwater was discovered within the pond area. This posed a risk of liner uplift after installation, potentially compromising the integrity of the pond. The issue was unforeseen and required an immediate and effective solution to maintain the project timeline. Following consultation with the client’s representatives, AGA designed and implemented a bespoke drainage system beneath the liner. This system channels groundwater into a collection chamber, where it is pumped out and discharged into the pond at a point 100 mm below the water level. This approach ensured long-term stability of the liner and preserved the pond’s structural integrity.

Final Enhancements

Prior to lining, AGA installed a sump trench and pump chamber at the base of the pond. Once the liner was in place and the pond filled, an AGA Lake Aid aeration system was introduced to enhance water quality and ecological balance.

The project was completed successfully, meeting both the technical and aesthetic goals of the client. Photographs included in the following pages show the pond immediately after completion and following a period of natural establishment.

Photographs below show the project on completion and after a period of establishment. 

The pond on completion:

Following a period of establishment:

Enviro-Fix (A.G.A. Group)

Environmental Contractors

Engineering Nature

If you have a question or enquiry, please do not hesitate to call our team. If it is outside business hours, drop us an email – we’d love to hear from you