Project Overview
The Lee Valley Ice Centre, located in the Lower Lea Valley, London, underwent a major redevelopment and expansion project to create a state-of-the-art ice rink facility.
The main contractor for this project was Buckingham Group, with Enviro-Fix contributing specialist environmental and landscaping solutions.
Client Requirement
As part of the redevelopment, the client required a sustainable water management solution to handle runoff from the new ice centre building and surrounding hard surfaces. The solution needed to meet functional requirements for attenuation while enhancing the visual appeal of the site.
Enviro-Fix was commissioned to design and install a custom attenuation pond to the client’s specification. The pond serves as a key component of the site’s sustainable drainage system (SuDS), ensuring effective runoff management while integrating seamlessly into the landscape design.
Project Overview
The Lee Valley Ice Centre, located in the Lower Lea Valley, London, underwent a major redevelopment and expansion project to create a state-of-the-art ice rink facility.
The main contractor for this project was Buckingham Group, with Enviro-Fix contributing specialist environmental and landscaping solutions.
Client Requirement
As part of the redevelopment, the client required a sustainable water management solution to handle runoff from the new ice centre building and surrounding hard surfaces. The solution needed to meet functional requirements for attenuation while enhancing the visual appeal of the site.
Enviro-Fix was commissioned to design and install a custom attenuation pond to the client’s specification. The pond serves as a key component of the site’s sustainable drainage system (SuDS), ensuring effective runoff management while integrating seamlessly into the landscape design.
- Buckingham Group
- Lee Valley Ice Centre
- £47,000
- Completed November 2022 (3 weeks)
Design and Features
- Pond Size: 750 m² total area spanning both sides of the paved entrance walkway.
- Planting: 450 m² of marginal aquatic and native wetland species, creating a biodiverse habitat and improving water quality.
- Functionality: Attenuates runoff from the ice centre building and adjacent hard surfaces.
- Aesthetic Value: Positioned at the frontage of the ice rink, the pond provides a visually appealing feature that complements the surrounding landscape.
Additional Components
- Filtration System: Installed by Enviro-Fix to maintain water quality and support the long-term sustainability of the pond ecosystem.
Collaboration and Integration
The pond installation formed part of a broader environmental strategy for the Lee Valley Ice Centre redevelopment. Enviro-Fix’s collaborative approach involved regular liaison with the client and project stakeholders to ensure alignment with design goals and regulatory requirements.
Project Outcome
The completed pond not only fulfils its primary purpose of managing surface water runoff but also enhances the site’s ecological value and visual appeal. It stands as a testament to Enviro-Fix’s expertise in delivering integrated water management and landscaping solutions.
Note: Enviro-Fix also installed a reed bed system for this project, which is documented in a separate case study.