
Alkerden Gardens Gabion Wall
We undertook the construction of a gabion retaining wall as part of the expansive Ebbsfleet Garden City development in Kent.
Interested in the types of restoration and excavation work we carry out? We share detailed case studies that break down each stage of the process.
Select a case study below to view full details

We undertook the construction of a gabion retaining wall as part of the expansive Ebbsfleet Garden City development in Kent.

We were commissioned to undertake embankment stabilisation works adjacent to a well-used public footpath and cycle route in an area managed by The Parks Trust.

We fulfilled this project from initial surveying and risk assessment to planning and consent applications, through to full design and delivery.

A restoration project was undertaken on an 80-metre stretch of riverbank along the River Churnet to stabilise the bank and more.

We were appointed by Hertsmere Borough Council to deliver essential riverbank stabilisation works along a 35-metre section of the Catherine Bourne river in South Mimms.

This project involved the installation of pre-vegetated coir roll revetments and scour protection measures, designed to stabilise the banks, encourage vegetation growth, and safeguard vulnerable infrastructure.

Enviro-Fix was commissioned by Chalfont St Giles Parish Council to deliver a full replacement of three ageing wooden boardwalks situated within a picturesque riverside setting popular with local residents and visitors.

We were awarded this contract to provide and install 295 linear metres of stock proof fencing consisting of sheep netting and 2 strand barbed wire attached to timber posts and much more.

We were contracted to carry out necessary restorations to the Comberton Village Pond.

The project involved the removal of an aging control structure at a pond in Maidstone followed by the installation of a new precast concrete headwall system.

We were awarded this contract to provide and install 295 linear metres of stock proof fencing consisting of sheep netting and 2 strand barbed wire attached to timber posts and much more.

We were contracted by Norwich City Council to undertake the landscaping of a new site to prepare for the installation of a series of sculptures.

We were contracted by Epsom and Ewell Borough Council to carry out a series of improvement and conservation works aimed at enhancing access, safety, and environmental resilience.

The primary objective was to replace the existing timber deck and parapet with a more durable and environmentally friendly alternative.

We were appointed by Havant Borough Council to carry out the replacement of approximately 50 metres of accessible beach boardwalk, including a seating platform.

Enviro-Fix recently completed a multifunctional flood alleviation and habitat creation project on behalf of Harrow Council in partnership with Wild Futures Outdoors Limited.

In June 2021 we were instructed by Three Willow Lakes in Hingham to construct a new 0.5 acre lake.

The works were completed to the agreed timescale with complete client satisfaction, and with no detrimental residual impact on the ecology.

We were contracted by Gallagher group to install a reed bed system on a new £32m industrial development at Aylesford, Kent.

We were contracted by Erith to install two inter-tidal reed beds within a former mooring area.

We installed a series of vegetated wall systems designed to provide a soft engineering solution to bank creation and stabilisation.

The project involved the construction of a new 22.5-metre ramped access path linking Ladbrook Place car park to the open space.

We were contracted by Barking and Dagenham Council to undertake the two-phase project to restore areas of the bank.

We were contracted to undertake works in the extensive grounds of a new build luxury home being built for a private client, situated adjacent to the River Great Ouse.

As part of the sustainable drainage strategy for a new housing development in Worksop, an attenuation pond was constructed to manage surface water runoff.

The Lee Valley Ice Centre, located in the Lower Lea Valley, London, underwent a major redevelopment and expansion project to create a state-of-the-art ice rink facility.

We were commissioned by Buckingham Group to install a reed bed system at the Lee Valley Ice Centre.

AGA Group Enviro-Fix Limited was contracted to line a newly excavated pond as part of a broader landscaping package for a rural site.

We were contracted by South Kesteven District Council to undertake footpath upgrade works in Sleaford, Lincolnshire.

We were appointed by Maidstone Borough Council to carry out pond de-silting and associated enhancement works across three public parks in Kent; this was delivered in two phases.

In this project we underwent the profiling of the riverbanks following the removal and burial of a large volume of Himalayan Balsam.

We were contracted by Morton Pattison to install a Geosynthetic Clay Liner (GCL) for a newly excavated pond at a rural site near Andover.

We embarked on a prestigious project to clear the overgrown vegetation surrounding the historic Norwich Castle.

In 2024, Bromsgrove District Council commissioned Enviro-Fix to undertake essential restorative works to the park’s pond which was built in the 1960’s.

We were engaged to carry out the replacement of a failed revetment structure on a private property.

We were appointed to this project for the installation of memorial gates, footpaths, a central plinth, and benches designed to offer a space for quiet reflection.

As part of the Reclaim the Rain initiative led by Norfolk County Council, this project at Thompson Marsh focused on improving resilience to flood and drought risk in small rural communities.

This project included the demolition of the existing log retaining structures along with their foundations, followed by the installation of new plastic sheet piling systems to replace them.

We delivered a technically demanding gabion wall installation at the Imperial College site in White City, West London.
If you have a question or enquiry, please do not hesitate to call our team. If it is outside business hours, drop us an email – we’d love to hear from you