Retaining Walls Piling At Watercliffe Meadows School

Project Summary

The scope of the project included the demolition of the existing log retaining structures along with their foundations, followed by the installation of new plastic sheet piling systems to replace them. 

The site itself posed several challenges, being built on several terraced levels, with access between these levels only possible via the public highway. All vehicle movements on site were carefully managed to avoid damaging sensitive surfaces and specialist playground equipment, which could not be relocated.  

Key Considerations

Access to the site was carefully planned to avoid restricted height zones and to protect sensitive surfaces and equipment, with temporary protective measures implemented where necessary.

During demolition, structural integrity was maintained and dust and noise were controlled, particularly in public areas. The installation of plastic sheet piling involved confirming ground conditions and anchoring requirements, as well as assessing the impact on nearby structures and drainage. Public safety was prioritised through the use of clear signage, physical barriers, and coordination with local authorities regarding highway access. 

Project Summary

The scope of the project included the demolition of the existing log retaining structures along with their foundations, followed by the installation of new plastic sheet piling systems to replace them.

The site itself posed several challenges, being built on several terraced levels, with access between these levels only possible via the public highway. All vehicle movements on site were carefully managed to avoid damaging sensitive surfaces and specialist playground equipment, which could not be relocated. 

Key Considerations

Access to the site was carefully planned to avoid restricted height zones and to protect sensitive surfaces and equipment, with temporary protective measures implemented where necessary.

During demolition, structural integrity was maintained and dust and noise were controlled, particularly in public areas. The installation of plastic sheet piling involved confirming ground conditions and anchoring requirements, as well as assessing the impact on nearby structures and drainage. Public safety was prioritised through the use of clear signage, physical barriers, and coordination with local authorities regarding highway access.

Photographs below show areas of work on completion