A.G.A. Group was engaged to carry out the replacement of a failed revetment structure on a private property. The project required careful planning, environmental sensitivity, and precise execution to meet both client expectations and regulatory standards.
The scope of works for this project included:
- Mobilisation of equipment to site
- Placement of skip on driveway for soil waste
- Rake back and set aside slate for reuse
- Removal of raised bed and tree stump
- Excavation behind failed board edging
- Removal of failed board edging section
- Installation of new board edging to match original level and height, in accordance with Environment Agency permit
- Installation of capping board along the full length of the revetment
- Installation of safety railings over a 12m central section
- Backfilling and levelling of garden area
- Laying of geotextile membrane and spreading of slate (including new slate)
- Demobilisation and site clean-up
Environmental Compliance
Due to the proximity of the works to a watercourse, A.G.A. Group applied for and obtained a Flood Risk Activity Permit (FRAP) from the Environment Agency. This ensured that all activities were compliant with environmental regulations and protected the integrity of the surrounding ecosystem.
Project Overview
A.G.A. Group was engaged to carry out the replacement of a failed revetment structure on a private property. The project required careful planning, environmental sensitivity, and precise execution to meet both client expectations and regulatory standards.
The scope of works for this project included:
- Mobilisation of equipment to site
- Placement of skip on driveway for soil waste
- Rake back and set aside slate for reuse
- Removal of raised bed and tree stump
- Excavation behind failed board edging
- Removal of failed board edging section
- Installation of new board edging to match original level and height, in accordance with Environment Agency permit
- Installation of capping board along the full length of the revetment
- Installation of safety railings over a 12m central section
- Backfilling and levelling of garden area
- Laying of geotextile membrane and spreading of slate (including new slate)
- Demobilisation and site clean-up
Environment Compliance
Due to the proximity of the works to a watercourse, A.G.A. Group applied for and obtained a Flood Risk Activity Permit (FRAP) from the Environment Agency. This ensured that all activities were compliant with environmental regulations and protected the integrity of the surrounding ecosystem.
- Private Client
- Thetford, Norfolk
- £14,961
- Completed (15 days)
Client Feedback
“We are very pleased with the installation. [The team] … were excellent and a delight to have on our property. We are very grateful for the care they took whilst working.”
Project Outcome
The project was completed on time and to a high standard. The team’s professionalism and attention to detail were praised, and the new revetment structure now provides both functional stability and aesthetic improvement.
The following photographs show work in progress and on completion
Enviro-Fix (A.G.A. Group)
Environmental Contractors
Engineering Nature
If you have a question or enquiry, please do not hesitate to call our team. If it is outside business hours, drop us an email – we’d love to hear from you