Footpath Upgrade Works in Lollycocks Field

Background

A.G.A. Group Enviro-Fix Ltd (AGA) were contracted by South Kesteven District Council to undertake footpath upgrade works in Sleaford, Lincolnshire. 

Lollycocks Field is a 2-hectare wildflower and wetland meadow which holds Local Nature Reserve (LNR) and Local Wildlife Site (LWS) status. The site contains standing water and wetland habitats, neutral grassland, and wet woodland and provides a valuable “green space” and educational resource for the local community and its school children.  The pathway along the edge is used as a commuting route.

Works here Comprised

  • Creation of a 28 -metre long ramp to the specification provided in line with planning permission, set out and agreed on site with client
  • Installation of a resin bound footpath measuring 140m long and 1.5m wide to link from the existing path to existing staircase/bottom of the new ramp 
  • Installation of 45m of wooden post and rail fence alongside the footpath upgrade as specified
  • A new wooden gate was installed
  • An existing metal gate was removed and cleaned, then replaced following the installation of the ramp with adjoining new metal estate railings to match into existing fencing.
  • Existing notice boards, bin and plaque were removed and replaced in a suitable location as agreed on site with the client. 

Background

A.G.A. Group Enviro-Fix Ltd (AGA) were contracted by South Kesteven District Council to undertake footpath upgrade works in Sleaford, Lincolnshire.

Lollycocks Field is a 2-hectare wildflower and wetland meadow which holds Local Nature Reserve (LNR) and Local Wildlife Site (LWS) status. The site contains standing water and wetland habitats, neutral grassland, and wet woodland and provides a valuable “green space” and educational resource for the local community and its school children.  The pathway along the edge is used as a commuting route.

Works here Comprised

  • Creation of a 28 -metre long ramp to the specification provided in line with planning permission, set out and agreed on site with client
  • Installation of a resin bound footpath measuring 140m long and 1.5m wide to link from the existing path to existing staircase/bottom of the new ramp
  • Installation of 45m of wooden post and rail fence alongside the footpath upgrade as specified
  • A new wooden gate was installed
  • An existing metal gate was removed and cleaned, then replaced following the installation of the ramp with adjoining new metal estate railings to match into existing fencing.
  • Existing notice boards, bin and plaque were removed and replaced in a suitable location as agreed on site with the client.

Earth for the ramp was site won & imported material from the excavation of the path and the reprofiling of the area around the ramp. The reprofiled section was raked to a fine tilth and then seeded with an Emorsgate Meadow mix.

Areas of disturbed ground were reinstated, and some areas re-seeded upon completion with seed mix approved by the landowner. Where habitats were unavoidably disturbed as part of the works, topsoil was carefully removed and then replaced upon completion of the works. Turfs were retained and reinstated where possible.  

Weather was monitored as significant rainfall could cause adverse working conditions preventing safe working. Works were completed to schedule and to the complete satisfaction of the client. 

Photographs showing the completed works are shown below and on the title page, and feedback from the client representative can be seen on the following page.

Client Feedback from South Kesteven District Council – Lollycocks Field

Performance to Budget

Excellent. The bid came under the budgeted amount for this project and A.G.A did not incur any additional expenses so project performed on budget.

Was the work completed on time and according to schedule?

Yes.

Comments on operatives/workforce provided

Great communication, friendly and helpful operatives. I was able to reach the team whenever I needed to.

Comments on project management and communication

Very good communication and project management. I received updates from the project manager on how the works were progressing which gave me confidence the works were on track, as they were.

Please comment on the standard of works completed

Excellent, everyone is really pleased.

Any other comments/feedback on the project

Thank you A.G.A, a job very well done.

Signed:

Corporate Project Officer

South Kesteven District Council

 

Enviro-Fix (A.G.A. Group)

Environmental Contractors

Engineering Nature

If you have a question or enquiry, please do not hesitate to call our team. If it is outside business hours, drop us an email – we’d love to hear from you