AGA Group Enviro-Fix Limited (AGA) were contracted to undertake the following works in the extensive grounds of a new build luxury home being built for a private client, situated adjacent to the River Great Ouse.
Lake Works
The existing lake on the property required partial dewatering, pumping into an allocated adjacent field using a baffle to strain it before dispersal. An amphibious excavator was used to remove vegetation and loose sediment from the lakebed, before installing a 40m long pre-vegetated coir roll revetment designed to vegetate and stabilise the lake banks. Coir rolls provide an excellent alternative to a hard revetment wall to establish a ‘soft’ and effective method of erosion control or to establish an immediate habitat. They also provide crucial enhancements in site biodiversity encouraging flora and fauna into the area.
Coir rolls used on this project were 2000mm x 300mm diameter; held in position with timber stakes which are driven to refusal and then cut off, so they are all level. The ends of the coir rolls were tied to each other using tying twine. Hardwood faggots were used under the coir rolls where needed to raise the height to suite the water level, which was given by the client. Fine’s retention membrane was installed behind the coir rolls to stop backfill from migrating under or through the coir and faggots.
To complete this phase of the works the soil was levelled out and back filled to the coir rolls and on the bank side. The banks were profiled back to desired levels, which were provided by the client.
Project Overview
AGA Group Enviro-Fix Limited (AGA) were contracted to undertake the following works in the extensive grounds of a new build luxury home being built for a private client, situated adjacent to the River Great Ouse.
Lake Works
The existing lake on the property required partial dewatering, pumping into an allocated adjacent field using a baffle to strain it before dispersal. An amphibious excavator was used to remove vegetation and loose sediment from the lakebed, before installing a 40m long pre-vegetated coir roll revetment designed to vegetate and stabilise the lake banks.
Coir rolls provide an excellent alternative to a hard revetment wall to establish a ‘soft’ and effective method of erosion control or to establish an immediate habitat. They also provide crucial enhancements in site biodiversity encouraging flora and fauna into the area.
Coir rolls used on this project were 2000mm x 300mm diameter; held in position with timber stakes which are driven to refusal and then cut off, so they are all level. The ends of the coir rolls were tied to each other using tying twine. Hardwood faggots were used under the coir rolls where needed to raise the height to suite the water level, which was given by the client. Fine’s retention membrane was installed behind the coir rolls to stop backfill from migrating under or through the coir and faggots.
To complete this phase of the works the soil was levelled out and back filled to the coir rolls and on the bank side. The banks were profiled back to desired levels, which were provided by the client.
- Bowles and Ayer
- Hemingford Grey, Cambridgeshire
- £300,000
- Completed May 2022 (3 months)
Photographs below show the coir rolls installed at the lake edge:
Due to AGA holding all the required materials in stock at our large aquatic nursery in Norfolk, we were able to mobilise materials as required to ensure that the vegetation did not become damaged during site storage or was without water for longer than required.
Because we vegetate our own coir rolls, this means that we can ensure good growth and a pre-established root system that is ready to be installed.
Jetty
Firstly, an old jetty was removed from the edge of the lake. The architect gave the brief that the new jetty had to line up with multiple features of the house such as steps, windows and even internal walls within the house, which overlooks the lake.
The old timber jetty was replaced with a 4.5m x 9m structure comprising driven oak posts and a steel and plastic sub-frame. The sub frame was prefabricated and bolted piece by piece to the driven oak posts; this was carried out from a pontoon. The furthest posts were floated into position and installed by hand, then posts were tied together using bracing to hold them in position. Once the posts were checked to be square and in position, the sub-frame was attached. Larch deck boards were secured with secret fixings.
Photographs of the newly installed jetty are shown below:
Hydro-seeding to Lake Bank
Following the lake works, two types of seed mix were applied to the lake banks using a hydro-seeding system. A Wetland & Pond Edge wildflower mix was sprayed in the lower, wetter areas, especially where silt had been placed and where the water level would rise to.
A Country Meadow wildflower mix was sprayed onto the banks and areas of ground that had been left bare from the lake works. All products used in the hydroseeding process are 100% organic and biodegradable, so there is no risk of contamination or damage to the environment.
Photographs of completed works shown below
The hydroseeding equipment is fitted with a length of hose sufficient to allow efficient application of hydroseeding mixture whilst keeping the hydroseeder a safe distance from the slope and behind any existing edge protection.
Knotweed Removal
AGA were also instructed to remove an area of Japanese Knotweed from the site whilst the project was in progress. Brush cutters were used to remove the vegetation in small sections. A 5T tracked excavator was brought in to grub out the roots.
All the plant material, including the roots were incinerated and arisings then wrapped and sealed in a geotextile membrane and buried on site deeper than 2m, in line with Environment Agency Guidelines.
Feedback received from Client following completion:
“Very good standard of works completed. Good combination of implementation skill backed up with strong technical advice to enable improvements to be sustained.”
Stuart Wallace BSC (Hons)
Special Projects Director