Installation of Aylesford Reed Bed
Project Overview
AGA Group were contracted by Gallagher group to install a reed bed system on a new £32m industrial development at Aylesford, Kent. The project involved off-site fabrication, on-site construction, and ecological planting, with a focus on long-term environmental performance and minimal maintenance.
Off-Site Fabrication
- Pipework System: All pipework was fabricated off-site to ensure precision and reduce on-site installation time. This included custom fittings and pre-assembled components aligned with the project’s technical drawings and specifications.
Project Overview
AGA Group were contracted by Gallagher group to install a reed bed system on a new £32m industrial development at Aylesford, Kent. The project involved off-site fabrication, on-site construction, and ecological planting, with a focus on long-term environmental performance and minimal maintenance.
Off-Site Fabrication
- Pipework System: All pipework was fabricated off-site to ensure precision and reduce on-site installation time. This included custom fittings and pre-assembled components aligned with the project’s technical drawings and specifications.
- Gallagher Group
- Aylesford, Kent
- £40,720
- Completed April 2024 (2 weeks)
Liner System Installation
- Underlay Membrane: A needle-punched underlay membrane was installed to protect the EPDM liner from punctures and abrasions caused by the sub-base.
- EPDM Liner: The flexible, durable EPDM liner was laid into the reed bed excavation, shaped to fit the contours of the site.
- Overlay Membrane: A second protective membrane was installed over the liner to safeguard it during the placement of sands and gravels.
Pipework Installation
- Pipework was installed in accordance with the engineering drawings and specifications. Inlet and outlet pipes were positioned and sealed using witches hats, tape, glue, and jubilee clips to ensure watertight connections.
Sands & Gravels
- Sands and gravels, supplied by others, were tipped within the working area and installed by A.G.A. Group. No dumper was required due to the proximity of the tipping location.
- The anchor trench was backfilled with gravel as specified, completing the liner securing process.
Planting
- Pre-Vegetated Coir Pallets: Instead of plug planting, pre-vegetated coir pallets were used. These pallets were cultivated at the nursery using mature bare-root plants (M.B.R.) at a density of 18 plants/m².
- The coir pallets featured a vigorous, pre-established root system, offering optimal conditions for plant establishment and long-term growth.
- A monoculture of Phragmites australis (common reed) was selected for its proven effectiveness in water filtration and resilience in wetland environments.
Phragmites australis (common red) planted in coir pallets at our Norfolk nursery:
The following photographs show work in progress: