Erosion control blanket provides surface stability to steep and vulnerable banks, margins and shorelines. Made with 100% natural coir, the erosion blanket will itself decompose after 3-5 years, providing ample growing time for any sown vegetation to establish.
Providing excellent silt collection properties, our erosion control blanket is a versatile solution for long-term embankment reconstruction.
If you have a question or enquiry, please do not hesitate to call our team. If it is outside business hours, drop us an email – we’d love to hear from you