Stock Proof Fencing - Cemetery Extension
Background
Cheddar Parish Council successfully implemented a plan to extend the village cemetery located beside the reservoir. Originally opened in 1993, the cemetery was nearing full capacity.
The extension has more than doubled its size, providing additional space for traditional and green burials.
Landscape and Infrastructure Enhancements
The new cemetery area has been thoughtfully landscaped with hedging, trees, and grassy pathways, creating a peaceful and welcoming environment for visitors. Additional improvements included upgrades to the car park and the main entrance.
Background
Cheddar Parish Council successfully implemented a plan to extend the village cemetery located beside the reservoir. Originally opened in 1993, the cemetery was nearing full capacity.
The extension has more than doubled its size, providing additional space for traditional and green burials.
Landscape and Infrastructure Enhancements
The new cemetery area has been thoughtfully landscaped with hedging, trees, and grassy pathways, creating a peaceful and welcoming environment for visitors. Additional improvements included upgrades to the car park and the main entrance.
- Cheddar Parish Council
- Cheddar, Somerset
- £76,500
- Completed January 2020 (10 weeks)
Project Initiation and Planning
AGA Group was awarded the contract in September 2019. The Project Manager worked closely with the client to determine the most suitable start date, taking into account the need to relocate sheep and apply herbicide to designated areas. A detailed timeline programme was issued and regularly reviewed with the client throughout the project.
Works
- Providing and installing 295 linear metres of stock proof fencing consisting of sheep netting and 2 strand barbed wire attached to timber posts.
- Providing and planting 253 linear metres of native species of hedging as per drawings, planted on the inside of the fencing. Prepared ground along a 1.5m wide strip to provide good soil conditions and as little competition from other vegetation as possible. Planted in a staggered double row 30cm apart with a minimum of 7 plants per metre. Each accompanied by a 45cm transparent spiral guard and cane.
- Levelled, treated and prepared the ground (3,660 Sq. m.) for seeding.
- Seeded Phase 2 area totalling 4,400 sq. m. with a wildflower meadow mix and general-purpose amenity seed mix.
- Laid new surfaces for roadway and parking, consisting of a formal tarmac approach and informal reinforced grass and improved drainage in over the approach and car park; 3.5m. x 32 l/m. tarmac roadway on 250mm sub-base with flush kerb. Kerb laid on haunches in dry-lean/concrete.
- Supply and installation of 55.no. standard silver birch 80-100mm girth, located precisely, as per drawings. Excavated tree pit, trees staked in place and secured with tree tie. Tree shelter provided around base of each tree.
Site Challenges and Weather Conditions
Work commenced during the winter months, presenting significant challenges due to extreme wet weather conditions. Despite delays, careful planning enabled the majority of the work to be completed before Christmas. Remaining tasks such as tree planting, seeding, and final touches were scheduled for completion in the New Year.
Sensitivity and Public Access
Given that the existing cemetery remained in use during construction, sensitivity and respect were paramount. Safe access for visitors was maintained at all times, and work was paused during burial services to ensure minimal disruption.
Project Management and Supervision
AGA’s Ecological Clerk of Works provided ongoing support and guidance throughout the project, ensuring environmental considerations were met. The project was led by AGA’s Construction Director acting as Project Manager, supported by a qualified SSSTS supervisor. This experienced team ensured the project was delivered to a high standard, on time, and in line with client expectations.
Meetings were arranged with the client at Cheddar prior to mobilisation and our Project Manager was able to respond to arrange a meeting within one or two working days as required by the client.
All works were completed to client satisfaction within the agreed time frame.
Photographs of completed works are shown below: