Riverbank Stabilisation – Catherine Bourne, South Mimms

Project Overview

AGA Group Enviro-Fix Ltd (AGA) was appointed by Hertsmere Borough Council to deliver essential riverbank stabilisation works along a 35-metre section of the Catherine Bourne river in South Mimms. The project aimed to address ongoing erosion, enhance ecological resilience, and improve the long-term stability of the riverbank in a sensitive and regulated floodplain environment.

Due to the nature of the works within a main river, a Bespoke Flood Risk Activity Permit (FRAP) was required from the Environment Agency. While AGA did not apply for the permit directly, the company provided a comprehensive methodology and supporting documentation to assist the client in securing the necessary approvals.

Scope of Works

AGA delivered a sustainable and environmentally sensitive solution using the Rootlok Green Wall System, a vegetated bag revetment designed for erosion control and habitat enhancement. The scope included:

  • Installation of 35 metres of vegetated bag revetment to stabilise the riverbank
  • Hydro-seeding of the Rootlok wall system using a tailored embankment seed mix to promote rapid vegetation establishment and increase species diversity
  • Localised landscaping behind the revetment, including ground preparation and hydro-seeding to encourage colonisation by native plant species

Project Overview

AGA Group Enviro-Fix Ltd (AGA) was appointed by Hertsmere Borough Council to deliver essential riverbank stabilisation works along a 35-metre section of the Catherine Bourne river in South Mimms. The project aimed to address ongoing erosion, enhance ecological resilience, and improve the long-term stability of the riverbank in a sensitive and regulated floodplain environment.

Due to the nature of the works within a main river, a Bespoke Flood Risk Activity Permit (FRAP) was required from the Environment Agency. While AGA did not apply for the permit directly, the company provided a comprehensive methodology and supporting documentation to assist the client in securing the necessary approvals.

Scope of Works

AGA delivered a sustainable and environmentally sensitive solution using the Rootlok Green Wall System, a vegetated bag revetment designed for erosion control and habitat enhancement. The scope included:

  • Installation of 35 metres of vegetated bag revetment to stabilise the riverbank
  • Hydro-seeding of the Rootlok wall system using a tailored embankment seed mix to promote rapid vegetation establishment and increase species diversity
  • Localised landscaping behind the revetment, including ground preparation and hydro-seeding to encourage colonisation by native plant species

Environmental & Technical Considerations

Recognising the regulatory requirements of working within a main river, AGA developed and supplied a detailed construction methodology to support Hertsmere Borough Council’s application for a Bespoke FRAP. This included:

  • Step-by-step construction sequencing
  • Environmental risk mitigation strategies
  • Pollution prevention and silt control measures
  • Emergency response protocols

This proactive support ensured the client could confidently engage with the Environment Agency and secure the necessary permissions.

Hydro-Seeding for Biodiversity

To enhance the ecological value of the site, AGA carried out hydro-seeding of the Rootlok system using a specialist embankment seed mix. This approach was designed to:

  • Promote rapid vegetation growth
  • Stabilise the soil structure
  • Encourage a diverse range of native plant species to thrive

Localised Landscaping

In addition to the main revetment, AGA undertook landscaping improvements in the area between the Rootlok bags and the existing fence line. This included:

  • Making good the adjacent ground to support natural colonisation
  • Applying a suitable hydro-seeded seed mix where appropriate to ensure successful establishment of localised plant species
  • Enhancing the visual and ecological integration of the works with the surrounding environment

Project Outcome

The project was delivered successfully, achieving:

  • A stabilised and resilient riverbank with improved flood resilience and erosion control
  • A green infrastructure solution that supports biodiversity and enhances the local landscape
  • Full regulatory compliance, with AGA’s methodology supporting the successful FRAP application
  • A demonstration of AGA’s capability in delivering environmentally sensitive engineering solutions

Photographs below show works in progress and following establishment

Enviro-Fix (A.G.A. Group)

Environmental Contractors

Engineering Nature

If you have a question or enquiry, please do not hesitate to call our team. If it is outside business hours, drop us an email – we’d love to hear from you