Riverbank Restoration on River Churnet
Project Overview
A restoration project was undertaken on an 80-metre stretch of riverbank along the River Churnet to stabilise the bank, prevent erosion, and enhance the ecological value of the area.
The works were carried out under a Flood Risk Activity Permit (FRAP) obtained by AGA Group, ensuring full compliance with environmental regulations.
Site Preparation and Daily Operations
To protect the watercourse during construction, a silt curtain was installed daily. This measure helped to contain sediment and prevent contamination of the river during the reprofiling and installation phases.
Project Overview
A restoration project was undertaken on an 80-metre stretch of riverbank along the River Churnet to stabilise the bank, prevent erosion, and enhance the ecological value of the area.
The works were carried out under a Flood Risk Activity Permit (FRAP) obtained by AGA Group, ensuring full compliance with environmental regulations.
Site Preparation and Daily Operations
To protect the watercourse during construction, a silt curtain was installed daily. This measure helped to contain sediment and prevent contamination of the river during the reprofiling and installation phases.
- F Ball and Co
- Cheddleton Business Park
- £62,124
- Completed July 2025 (4 weeks)
Bank Reprofiling and Material Installation
The riverbank was carefully reprofiled to agreed levels and shapes, creating a stable foundation for the erosion control system. Following this, a combination of MacMat R, rock rolls, and coir rolls were installed in accordance with the approved design sketch.
MacMat R, a mesh-reinforced three-dimensional geomat, was used to provide long-term erosion control on the sloped embankments. Rock rolls added structural reinforcement, while coir rolls contributed to vegetative growth and bank stability.
The following photographs show MacMat R and Turf Reinforcement membrance in place on the riverbank:
MacMat R
Turf Reinforcement Membrane
Topsoiling and Vegetation Works
Topsoil was applied and levelled behind the coir rolls to bring the bank up to the required level for TRM (Turf Reinforcement Mat) seeding. Additional topsoil was also levelled along the path edges to ensure a smooth and natural transition between the restored bank and adjacent pathways.
Outcome
The restoration works successfully stabilised the riverbank, reduced erosion risk, and created a more resilient and ecologically beneficial edge to the River Churned. The use of natural and engineered materials ensured both environmental sensitivity and long-term durability.
The two photographs below show the riverbank before works commenced and on completion – the blue areas on the riverbank indicate where hydroseeding has taken place, which ensures good coverage of seed and swift establishment.